"THE BEST VALUE FOR ALL YOUR SITE DEVELOPMENT AND PAVING NEEDS."

Ranger Awarded $80.4 Million Design-Build Contract for Segment D of I-75 Express

Project Details

Project Name: I-75 Express Segment D
Project Location: Broward County, Florida
Project Value: $80.437 Million
Project Owner: FDOT
Project Scope:

Ranger Construction has been awarded an $80.437 million design-build contract to add variable-toll express lanes to a section of I-75 in Broward County. Ranger’s contract covers Segment D, a 3.7-mile section from south of Sheridan Street to north of C-11 Canal Bridge (north of Griffin Rd.).

Ranger is also constructing Segment C of I-75 Express. They are two of five segments that together will add 15 miles of managed toll lanes, two lanes in each direction, built within I-75’s existing median and extending from I-595 south into Miami-Dade County, with designated ingress and egress points along the way.

A similar 13-mile project in Miami-Dade County will connect I-75 Express to Palmetto Express (SR-826), extending the toll lanes south past the Dolphin Expressway (SR-836) near Miami International Airport. FDOT Districts 4 and 6 are working collaboratively on the projects.

Project Start: Est. Mid-2014
Project Completion: 850 Days
Additional Information:

I-75 Express Overview

Project Segmentation Map