SR-100 and SR-11 · Flagler County, FL

Bottom left: Dozer Operator Wiley Thomas levels dirt during the construction of a “reinforced earth” ramp for GC Leware Construction on the SR-100 bridges project near Bunnell in Flagler County.

Bottom right: Not far from the SR-100 job is another Leware job, SR-11, where a seven-mile stretch was closed for the construction of three bridges and two box culverts. Ranger performed the milling and resurfacing work, along with shoulder and approach construction. Here, Loader Operator Mike Richards takes a load of waste material to a waiting truck.

rgn_sr100_dozer rgn_sr11_loader

Contact Ranger Construction Industries, Inc. Today!

Proud to be a member of The Vecellio Group

Skip footer, return to top of page