After finishing milling and resurfacing 2.5 miles of SR-715 in Pahokee (shown at top right) earlier this year, Ranger is finishing work on the adjoining project to the south, nine miles of SR-715 in Belle Glade.
Both projects involved adding shoulders and slopes. Shown at right is Dozer Operator Don Barton, while at the bottom right is Grader Operator Abran Cantu running a road widener, both on the Belle Glade project.