Ranger Construction‘s South Division has entered the last phase of site preparation for Vecenergy’s new fuel terminal at Port Everglades in Ft. Lauderdale, Fla. The final phase includes all paving work at the facility, which contains 11 petroleum storage tanks totaling 1.35 million barrels (56.7 million gallons) of bulk fuel capacity. Petroleum products will be dispensed to tanker trucks through a state-of-the-art distribution rack. The first new terminal at the port since the 1970s, the facility will account for a tenth of port capacity.
Contact Ranger Construction Industries, Inc. Today!
Proud to be a member of The Vecellio Group