Ranger Construction‘s South Division nears completion on the site work and paving for Vecenergy’s new petroleum terminal at Port Everglades in Ft. Lauderdale, Fla.
The facility has 12 storage tanks totaling 1.35 million barrels (56.7 million gallons) of bulk fuel capacity. Several tanks have an internal, floating “roof within a roof” to directly cover the petroleum product regardless of product level within the tank.