Ranger South Finishes Site Work For Vecenergy’s Petroleum Terminal At Port Everglades

VCY_PortEvTanks_Nov08_033b2

VCY_PortEvTanks_Nov08_032Ranger Construction‘s South Division nears completion on the site work and paving for Vecenergy’s new petroleum terminal at Port Everglades in Ft. Lauderdale, Fla.

The facility has 12 storage tanks totaling 1.35 million barrels (56.7 million gallons) of bulk fuel capacity. Several tanks have an internal, floating “roof within a roof” to directly cover the petroleum product regardless of product level within the tank.

Above: Willie Leeks, Corey McNear and Deus DuFrene of Ranger South work at Vecenergy’s Port Everglades terminal in Ft. Lauderdale, Fla.
Above: Willie Leeks, Corey McNear and Deus DuFrene of Ranger South work at Vecenergy’s Port Everglades terminal in Ft. Lauderdale, Fla.
Above: John Parker and Chris Brannam of Ranger South look over Vecenergy’s petroleum terminal at Port Everglades, Fla.
Above: John Parker and Chris Brannam of Ranger South look over Vecenergy’s petroleum terminal at Port Everglades, Fla.

Contact Ranger Construction Industries, Inc. Today!

Proud to be a member of The Vecellio Group

Skip footer, return to top of page